True HQ - 10M HDMI Cable v1.4 by True HQ™ | HIGH SPEED Long Lead with Ethernet ARC 3D | Full HD 1080P PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV | Black & Gold Plated
EGP 199EGP 229
Save 13%
- [10 METER HDMI CABLE] - High-Speed HDMI to HDMI 1.4a Long Lead with Ethernet and ARC (Audio Return Channel). Finished with 24K gold plated connectors for flawless crisp signal transmission. NOT SUITABLE for 4K 2160p resolutions at 60Hz. FOR 4K HDMI 2.0 PLEASE CHECK OUR OTHER LISTINGS OR SEARCH ASIN: B09F37BLQS
- [WIDE COMPATIBILITY] – These cables are compatible with a range of devices that support HDMI. A perfect match for CCTV, Freeview/Freesat and Sky HD TV, PS4 & Xbox One Gaming Consoles, Blu-Ray & DVD Players, Home Cinema, AV Receivers, PC, Laptops, HDTV, Projectors. They are not compatible with Sky Q, PS4 Pro, Xbox One X and 4K Blu Ray Players when the resolution in set higher than 1080p.
Price History (Last 30 Days)
Updated todayLowest
EGP 180
Highest
EGP 325
Avg. Price
EGP 230
In stock and shipping
Item is currently in stock and ready to ship.